{
    "schemaVersion": "ooitech-article.v1",
    "url": "https://www.ooitech.com/bc-stringer-retrofit-black-gap-film-all-black-modules.html",
    "language": "en",
    "title": "Two-Year-Old BC Stringer, Retrofitted for All-Black Modules",
    "description": "A BC stringer delivered two years ago now runs black gap film for all-black modules. What the retrofit added, why the film matters, and how negative spacing works.",
    "keywords": "bc stringer, black gap film, all black module, negative spacing, bc cell, bc module, stringer retrofit, ooitech",
    "ogType": "website",
    "image": "https://cdn.ooitech.com/static/upload/image/20261126/bc-stringer-zhuhai-aoi-inspection.webp",
    "headings": [
        {
            "level": 1,
            "text": "Two-Year-Old BC Stringer, Retrofitted for All-Black Modules"
        },
        {
            "level": 2,
            "text": "Two-Year-Old BC Stringer, Retrofitted for All-Black Modules"
        },
        {
            "level": 2,
            "text": "Why an all-black module needs a black gap film"
        },
        {
            "level": 2,
            "text": "Negative spacing: the capability that was already on the machine"
        },
        {
            "level": 2,
            "text": "Adding a film station: four tolerances and one takt"
        },
        {
            "level": 2,
            "text": "Is a retrofit worth it"
        },
        {
            "level": 2,
            "text": "BC cells, BC modules, BC stringers"
        },
        {
            "level": 2,
            "text": "From Wuhan to Zhuhai: how a retrofit scope is set"
        },
        {
            "level": 2,
            "text": "About Ooitech"
        },
        {
            "level": 5,
            "text": "Tags :"
        },
        {
            "level": 5,
            "text": "Table of Contents"
        },
        {
            "level": 5,
            "text": "Category"
        },
        {
            "level": 5,
            "text": "Related Posts"
        },
        {
            "level": 6,
            "text": "30MW BIPV Solar Panel Production Line"
        },
        {
            "level": 6,
            "text": "Cosmic Solar Purchases 5MW Semi-Automatic Solar Panel"
        },
        {
            "level": 6,
            "text": "Solar Panel Production Line in Egypt: 4 Projects"
        },
        {
            "level": 6,
            "text": "American Green Energy Company Purchases Ooitech"
        },
        {
            "level": 6,
            "text": "SUNUSA Orders 5MW Semi-Automatic Solar Panel Production"
        },
        {
            "level": 5,
            "text": "Recent Post"
        },
        {
            "level": 6,
            "text": "UV Dose in IEC Tests: How Many Months Outdoors?"
        },
        {
            "level": 6,
            "text": "Two-Year-Old BC Stringer, Retrofitted for All-Black Modules"
        },
        {
            "level": 6,
            "text": "Qualifying a New Encapsulant Film: Four Gates to Volume"
        },
        {
            "level": 5,
            "text": "Popular Tags"
        },
        {
            "level": 3,
            "text": "Request A Quote"
        },
        {
            "level": 2,
            "text": "We deliver expertise you can trust our service"
        },
        {
            "level": 3,
            "text": "Cost-Effective Advantages"
        },
        {
            "level": 3,
            "text": "Our Experience Team"
        },
        {
            "level": 3,
            "text": "15+ Years Industry Experience"
        },
        {
            "level": 2,
            "text": "What Our Client Say's about us"
        },
        {
            "level": 3,
            "text": "Jizzakh Polytechnic Institute"
        },
        {
            "level": 3,
            "text": "Diarra From Africa"
        },
        {
            "level": 3,
            "text": "Amjad"
        },
        {
            "level": 3,
            "text": "Mark"
        },
        {
            "level": 3,
            "text": "KTECH"
        },
        {
            "level": 2,
            "text": "Our Latest Products"
        },
        {
            "level": 3,
            "text": "DH200-Y Automatic Bussing Machine: 17s Cycle Time"
        },
        {
            "level": 3,
            "text": "PV Ribbon Production Line: Drawing, Rolling, Tinning"
        },
        {
            "level": 3,
            "text": "OPT-S110H Offline String EL Tester: ≤2s, 4.6MP"
        },
        {
            "level": 3,
            "text": "SC-20P BC Cell Laser Cutting Machine"
        },
        {
            "level": 3,
            "text": "ST-TLD3A+ IV Tester – PV Module Flash & Performance"
        },
        {
            "level": 3,
            "text": "OTCT Solar Cell Tester: IEC 60904-9 A Grade"
        }
    ],
    "wordCount": 2844,
    "markdown": "# Two-Year-Old BC Stringer, Retrofitted for All-Black Modules\n\n> A BC stringer delivered two years ago now runs black gap film for all-black modules. What the retrofit added, why the film matters, and how negative spacing works.\n\n![Two-Year-Old BC Stringer, Retrofitted for All-Black Modules](https://cdn.ooitech.com/static/upload/image/20261126/bc-stringer-zhuhai-aoi-inspection.webp)\n\n- ** Ooitech Editorial Team\n- ** 2026-11-26\n- ** 0 Views\n- ** [News](./News.html)\n\nEditorial responsibility for this article rests with **Wuhan Ooi Photoelectric Technology Co., Ltd.** Written and reviewed by the Ooitech editorial team. See our [editorial policy](/editorial-policy.html) for how we write, where AI tools are used, and how to request a correction.\n\n## Two-Year-Old BC Stringer, Retrofitted for All-Black Modules\n\n**Quick answer:** A BC stringer delivered to a module plant two years ago has been retrofitted to lay black gap film between cells, and now runs all-black modules. The frame, conveyor, welding unit and string inspection stayed. What was added is a film station — unwind, slit, cut to length, vision alignment, heated bonding, post-bond inspection — plus rewritten recipes. The film is not decoration: in a negative-spacing string the cell edges almost touch, and the film masks the white backsheet that shows through the gap, isolates the cell edge from the ribbon, and buffers the joint through lamination and thermal cycling.\n\nAt two in the afternoon on 5 November, a BC stringer was running at a module plant in Zhuhai. On the string-inspection monitor, positions 1 through 11 each came back OK. An hour later, two finished strings lay side by side on a workbench, a thin black line running between cell after cell.\n\nThe machine was delivered two years ago. Its process list said “negative spacing supported”. It now does one more thing: it lays a black film strip in the gap between cells.\n\nThe machine did not change. The cells on the market did, and so did what an all-black module is expected to look like.\n\n![BC stringer at a Zhuhai module plant, string inspection screen showing positions 1 to 11 all OK, cells moving on the conveyor below](https://cdn.ooitech.com/static/upload/image/20261126/bc-stringer-zhuhai-aoi-inspection.webp)\n\n## Why an all-black module needs a black gap film\n\nA BC cell has no gridlines and no ribbon on its front face, so a single cell reads as one even sheet of dark blue. That is the starting point for an all-black module, not the finished result. One black cell is not one black module. There is a gap between neighbouring cells, a wider gap between strings, and a busbar zone along one edge. Those places show white backsheet or white encapsulant. A field of black cells with white lines running through it looks, from ten metres away, like glass that has not been cleaned.\n\nThe black gap film covers exactly those places. It is bonded over the cell-to-cell gap where the edges overlap, over the string-to-string gap, and over the busbar area, so the module reads as one colour from frame to frame. On a residential roof or a BIPV fa&ccedil;ade the module is part of the building envelope, and the customer judges the colour before the wattage.\n\nThe film is also a functional layer. In a negative-spacing string the edges of adjacent cells sit very close together, sometimes overlapping. A strip of film between them separates the cell edge from the ribbon electrically and absorbs part of the compressive stress mechanically. A module goes through lamination, transport, thermal cycling and damp heat, and the cell edge is where chipping and micro-cracks start. The film gives that edge a buffer. The film itself has to hold its colour under UV; a film that yellows in two or three years leaves a black module looking patchy.\n\n## Negative spacing: the capability that was already on the machine\n\nBC moves both polarities to the back of the cell, which frees the front face of ribbon. On the module side that means cells can be pushed closer together than a front-contact design allows: the gap goes to zero, and then past zero, so the cell edges overlap slightly. The industry calls it negative spacing.\n\nIt sounds like packing cells tighter. It is mostly a precision problem. When two cells overlap, the amount of overlap and the force holding them down both have to be controlled; a little off-centre and the edge chips, a little too much pressure and the cell cracks. The machine finds fiducials on the rear face with vision, places each cell against a virtual coordinate grid, centres the gripper, limits the downward force, and holds repeatability on the conveyor.\n\nWhen this machine was delivered two years ago, negative spacing was already in its process list. All-black modules were less common then, and negative spacing solved a narrower problem: make the gap as small as possible. A small gap is not a black module. The cell edge still catches light, and the white backsheet still shows through the seam. Closing the gap is the first half of the job. The film is the second half.\n\n## Adding a film station: four tolerances and one takt\n\nApplying the film is not a matter of pressing tape onto a cell. A roll is unwound, slit to width, cut to length for the cell format, transferred to the cell edge, bonded with heat, then pressed. Every step carries a tolerance. A film that is too wide wraps onto the front of the cell; too narrow and the seam stays visible. A film placed a fraction of a millimetre off produces a crooked black line after lamination. Unstable tension wrinkles the strip, and a wrinkle becomes a bubble under the encapsulant. Too little heat and the adhesive does not wet out; too much and the film is damaged.\n\nThese motions also have to fit the stringer’s takt. The stringer will not stop and wait for a film station. The station has to pick, align, bond and reset inside the transfer window the stringer already provides. The difficulty in a retrofit is not any single mechanism; it is takt, accuracy and line control agreeing with each other.\n\nOoitech built the film function as a station inside the stringer: unwind, slit, cut to length, vision alignment, heated bonding and post-bond inspection, tied into the existing motion control and HMI. The frame, conveyor, welding unit and string inspection were kept. The control programs and recipes were rewritten, and the operator switches between “negative spacing” and “negative spacing + film” on the same screen.\n\nFilm comes from different suppliers with different thickness, adhesive and width. Tension, temperature and bonding pressure are exposed as parameters, so a new film lot is a recipe change rather than a mechanical change.\n\n![Finished cell strings leaving a BC stringer at the Zhuhai plant, with the string inspection monitor above the conveyor](https://cdn.ooitech.com/static/upload/image/20261126/bc-stringer-zhuhai-strings-inspection.webp)\n\n## Is a retrofit worth it\n\nA BC stringer is not a cheap machine. Replacing one means capital, lead time, teardown, recommissioning and weeks of stopped production. For a plant with orders on the books, the stopped weeks often cost more than the machine.\n\nA retrofit keeps the frame, conveyor, welding unit and inspection, adds the film station, and changes control and software. The asset stays in service, the stoppage is scheduled into a changeover window, and acceptance runs on the customer’s own cells and film against EL and appearance criteria.\n\nFor the customer the arithmetic is direct: a new process does not require a new machine, and the retrofit cost and the downtime are not in the same bracket as a purchase.\n\nThis is what the Ooitech team has been doing for the past two years. The customer’s cells keep changing — thinner, larger, denser rear metallisation; the film changes; the module format changes. The machine has to follow. Process trials run at the Wuhan application lab, mechanisms and controls are built at the Jiangyin plant, and engineers commission on site, tune the recipes and train the operators. After the retrofit, the engineer stays with the batch until it runs stable; when a film lot or a cell supplier changes, the parameters are run again. Drawings, annotated PLC and HMI programs and the spare-parts list are handed over at acceptance, so the customer can change a recipe without calling us.\n\n| Item | Retrofit | New machine |\n| --- | --- | --- |\n| Frame, conveyor, welding unit, inspection | Kept | Bought again |\n| Film station | Added | Included |\n| Control programs and recipes | Rewritten | New |\n| Line stoppage | Scheduled changeover window | Teardown and recommissioning |\n| Acceptance | Customer cells and film, EL and appearance | Same, after installation |\n\n## BC cells, BC modules, BC stringers\n\nBC stands for back contact. Both electrodes sit on the rear of the cell and the front carries no metal grid. IBC, ABC and HPBC all belong to this family.\n\nFreeing the front face is the direct reason BC is efficient. A conventional cell prints busbars and fingers on the front, and those metal lines shade part of the light-receiving area. BC moves the metal to the back, so the whole front collects light; the rear fingers can also be made wider, which lowers series resistance. The cost is in manufacturing: alternating p and n regions on the rear need more masking, patterning and alignment steps, at tighter tolerances than a front-contact cell.\n\nFor a module maker, BC changes three things. The front absorbs more light, so the same area yields more power. The front colour is uniform, which suits all-black designs. And because the rear carries the pattern, interconnection can only happen there.\n\nThere are two interconnection routes: ribbon soldering and conductive adhesive. Both align and join on the rear face, and neither leaves anything on the front. That is also why a BC module pairs with a black frame, black backsheet and black busbar. The front is already clean; a white frame or a white backsheet edge undoes the work.\n\nA BC stringer does exactly this job: automatic loading, rear-side alignment, rear-side interconnection, welding, string inspection, unloading. Its main difference from a conventional stringer is that it never sees the front face. Cameras find fiducials on the rear, the joints sit on the rear, and fixtures, heating and inspection stations are rebuilt around that. Negative spacing, black gap film and hidden busbars are all processes that grew out of one constraint: nothing on the front.\n\nThe market data points the same way. In September 2026 Wuxi Lead Intelligent Equipment reported cumulative shipments of more than 10 GW of its BC full-screen stringer. In October 2026 JinkoSolar introduced an all-black 48-cell module rated at 510 W, built with zero spacing and hidden busbars. All-black has moved from trade-show samples into production schedules.\n\n## From Wuhan to Zhuhai: how a retrofit scope is set\n\nNo two machines arrive in the same condition. Wear on the frame and conveyor, the accuracy left in the welding unit, the version of the vision system and the spare capacity in the control cabinet all change what a retrofit has to include. Some machines run with a film station and new software. Others need conveyor accuracy and vision recalibrated first. The scope is written per machine, and what cannot be done is stated before the quotation, not after the deposit.\n\nThe Zhuhai machine was the first kind. Two years ago it did negative spacing. It now also places film. Nothing was replaced in between: a few process reviews, one film station, several versions of control software, and the days the engineers spent on the shop floor.\n\n![Two finished BC cell strings on a workbench at the Zhuhai module plant, with a roll of high-temperature tape and a marker pen beside them](https://cdn.ooitech.com/static/upload/image/20261126/bc-stringer-zhuhai-two-strings.webp)\n\nThey wait for the laminator. The next batch of cells will run on the same machine.\n\n## About Ooitech\n\nWuhan Ooi Photoelectric Technology Co., Ltd. has built photovoltaic production equipment and industrial laser systems for more than fifteen years, with an engineering and process laboratory in Wuhan and a manufacturing plant in Jiangyin. The product range covers cell laser scribing, stringers (MBB, BC and shingled), layup, busbar soldering, taping, lamination, framing, junction-box soldering and potting, EL/IV testing and line conveyors, exported to Poland, Korea, Mexico, Hungary, India, Egypt, Kazakhstan, Algeria, Saudi Arabia, Colombia and Indonesia, among others.\n\nOn BC, Ooitech has run cell experiments and pilot equipment and has delivered complete lines. Every machine is handed over with electrical drawings, annotated PLC and HMI programs, a spare-parts list and maintenance manuals; non-human damage is covered by a one-year warranty, with lifetime service after that.\n\nFor a retrofit assessment, send the machine model, the cell format you plan to run and the film you intend to use: [info@ooitech.com](mailto:info@ooitech.com) · WhatsApp +86 159 6159 2660 · [request a quote](/Quote.html).\n\n---\n\n##### Tags :\n\n![](/template/ooitech/assets/img/shape/06.png)\n\n![](https://cdn.ooitech.com/runtime/image/w800_h700_fitblur_v2_w800_h700_fitblur_v2_1757399770541443.webp)\n\n### Request A Quote\n\nAll uploads are secure and confidential.\n\n## We deliver expertise you can trust our service\n\nDirect-from-Factory Equipment.\n\n![](/template/ooitech/assets/img/icon/money-2.svg)\n\n### Cost-Effective Advantages\n\nWe deliver exceptional value, maximizing results while optimizing budgets for clients.\n\n![](/template/ooitech/assets/img/icon/staff.svg)\n\n### Our Experience Team\n\nOur skilled professionals specialize in innovative solutions and tailored strategies.\n\n![](/template/ooitech/assets/img/icon/certified.svg)\n\n### 15+ Years Industry Experience\n\nDeep expertise ensures reliable, trend-aware, and proven outcomes for success.\n\n![](https://cdn.ooitech.com/static/upload/image/20250910/1757477357667605.webp )\n\n![](https://cdn.ooitech.com/static/upload/image/20250910/1757477724911512.webp)\n\n![](/template/ooitech/assets/img/shape/06.png)\n\n## What Our Client Say's about us\n\nClient testimonials praise our deep understanding of their challenges, which leads to innovative solutions and strong ROI. Long-term collaborations—some over a decade—demonstrate their trust and satisfaction. Their success stories drive us to continually exceed expectations. [Know More **](#quote-form)\n\n![](/template/ooitech/assets/img/icon/quote.svg)\n\nA man with a big soul. Thank you very much for your visit Mr Wu. Thank you very much for the services provided in installing equipment and training my students. The kindest person and professional in his field\n\n![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_2026041716444445.webp)\n\n### Jizzakh Polytechnic Institute\n\n![](/template/ooitech/assets/img/icon/quote.svg)\n\nthank you for ooitech's professional support and on time after service.\n\n![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1784509010217979.webp)\n\n### Diarra From Africa\n\n![](/template/ooitech/assets/img/icon/quote.svg)\n\nThanks to Ooitech for providing the fully automated production equipment—your installation and after-sales service have been excellent.\n\n![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_2026041720921238.webp)\n\n### Amjad\n\n![](/template/ooitech/assets/img/icon/quote.svg)\n\nThank you again so much again for the very big big help for improving and fixing the factory and also teaching the workers how to use the machines\n\n![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1757479675272137.webp)\n\n### Mark\n\nBIPV Philippines\n\n![](/template/ooitech/assets/img/icon/quote.svg)\n\nThanks to Ooitech for providing highly suitable BC solar cell experimental equipment.\n\n![](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1776426122864564.webp)\n\n### KTECH\n\n## Our Latest Products\n\n![DH200-Y Automatic Bussing Machine: 17s Cycle Time](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774348162498246.webp)\n\n- [** Rachael](./automatic-bussing-machine-dh200-y-solar-panel-busbar-soldering-equipment-ooitech.html)\n- [** 88102](./automatic-bussing-machine-dh200-y-solar-panel-busbar-soldering-equipment-ooitech.html)\n\n### DH200-Y Automatic Bussing Machine: 17s Cycle Time\n\nOoitech DH200-Y Automatic Bussing Machine delivers high-speed electromagnetic busbar soldering with 17s cycle time\n\n![PV Ribbon Production Line: Drawing, Rolling, Tinning](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_2026051194879300.webp)\n\n- [** ooitech](./pv-busbar-ribbon-integrated-drawing-rolling-tinning-production-line.html)\n- [** 850](./pv-busbar-ribbon-integrated-drawing-rolling-tinning-production-line.html)\n\n### PV Ribbon Production Line: Drawing, Rolling, Tinning\n\nProfessional integrated PV busbar ribbon production line combining wire drawing, rolling, flat drawing, annealing and tin coating processes for high\n\n![OPT-S110H Offline String EL Tester: ≤2s, 4.6MP](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774350940561245.webp)\n\n- [** Rachael](./offline-string-el-tester-opt-s110h-solar-cell-string-electroluminescence-testing-equipment-ooitech.html)\n- [** 88527](./offline-string-el-tester-opt-s110h-solar-cell-string-electroluminescence-testing-equipment-ooitech.html)\n\n### OPT-S110H Offline String EL Tester: ≤2s, 4.6MP\n\nOPT-S110H Offline String EL Tester from Ooitech delivers high-speed electroluminescence inspection for solar cell strings up to 1250mm.\n\n![SC-20P BC Cell Laser Cutting Machine](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1772440338787287.webp)\n\n- [** ooitech](./SC-20P-Automatic-Solar-Cell-Laser-Cutting-Machine-High-Precision-BC-Cell-Processing-Equipment.html)\n- [** 21032](./SC-20P-Automatic-Solar-Cell-Laser-Cutting-Machine-High-Precision-BC-Cell-Processing-Equipment.html)\n\n### SC-20P BC Cell Laser Cutting Machine\n\nSC-20P is an upgraded laser cutter based on SC-20A, designed for BC cells. It synchronously cuts both the cell and protective paper into 1/2 pieces\n\n![ST-TLD3A+ IV Tester – PV Module Flash & Performance](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_1774514799764615.webp)\n\n- [** Rachael](./Solar-Panel-IV-Tester-ST-TLD3A-SMTL-V21-3A-Professional-PV-Module-Testing-Equipment.html)\n- [** 38430](./Solar-Panel-IV-Tester-ST-TLD3A-SMTL-V21-3A-Professional-PV-Module-Testing-Equipment.html)\n\n### ST-TLD3A+ IV Tester – PV Module Flash & Performance\n\nST-TLD3A+ / SMTL-V21.3A+ solar IV tester – A+ spectrum, tests mono, poly, TOPCon, HJT, IBC & thin film. Accurate I-V/P-V curves for full module\n\n![OTCT Solar Cell Tester: IEC 60904-9 A Grade](https://cdn.ooitech.com/runtime/image/w800_h600_fitblur_v2_2026032746397289.webp)\n\n- [** Rachael](./OTCT-A-Solar-Cell-Tester-High-Precision-Electric-Performance-Testing-Equipment.html)\n- [** 16731](./OTCT-A-Solar-Cell-Tester-High-Precision-Electric-Performance-Testing-Equipment.html)\n\n### OTCT Solar Cell Tester: IEC 60904-9 A Grade\n\nOTCT-A solar cell tester – A-grade spectrum xenon lamp, 16-bit 4-ch acquisition, IEC60904-9:2020. Accurate IV curve measurement for mono &amp\n",
    "endpoints": {
        "html": "https://www.ooitech.com/bc-stringer-retrofit-black-gap-film-all-black-modules.html",
        "markdown": "https://www.ooitech.com/bc-stringer-retrofit-black-gap-film-all-black-modules.md",
        "agentManifest": "https://www.ooitech.com/.well-known/agent.json",
        "llmsTxt": "https://www.ooitech.com/llms.txt",
        "sitemap": "https://www.ooitech.com/sitemap.xml",
        "quote": "https://m.ooitech.com/api/quote.php"
    }
}
